Charge points
Do I need a three-phase connection for a charge point?
On single-phase you typically charge up to around 3.7 kW. If you want to charge faster, a three-phase connection is required.
With a single-phase connection, charging power is limited. For 11 kW or 22 kW you need a three-phase connection, plus a consumer unit and cabling sized for it.
Whether faster charging is necessary depends on your driving pattern. Anyone charging overnight at home often has plenty with a lower power.
Switching to three-phase
Upgrading to three-phase is arranged through your grid operator. We handle the electrical preparation inside the home: consumer unit, distribution and cabling.
Further reading
Advice for your own situation
General explanations help, but your home or building is specific. We're happy to work through your situation in concrete terms.
