Skip to main content
Business project · EV charging

Charging hub at Verra Makelaars: four Zaptec Pro charging stations

For Verra Makelaars, Horst Energy Solutions installed a charging facility with four Zaptec Pro charging stations on two dual posts. A clear layout that gives electric charging a permanent place on site.

Two dual posts with charging stations along the car park fence
Overview of the two dual posts
Opened paving with a trench for the cable route
Cable route during installation
Zaptec Pro charging station under a canopy on a dual post in the car park
Installation photo: Zaptec Pro charging station on the dual post
Side view of a dual post with Zaptec Pro, second post in the background
Side view along the paving
Dual post with two charging stations back to back
Dual post with two charging stations

Client question

A practical charging facility on their own premises, with several charging points in a clear layout.

Our solution

We installed four Zaptec Pro charging stations, spread over two dual posts, and took care of the associated electrical connection. The layout brings four charging points together in a compact location.

Result

A charging facility with four charging points, suited to the location and everyday use.

Planning charging points at your premises?

Tell us about your premises, your connection and the number of charging points you have in mind.